greenvuba

Automated Transit Networks

The Future of Urban Mobility is Here

GreenVuba delivers driverless, electric, elevated transit — fast, safe, and financially self-sustaining. In public operation since 2023.

99.8%

Reliability / Availability in 2025

2023

In Public Operation Since

2 min

Average Wait Time

Automated Transit Networks

Legacy Transit is Failing Our Cities

Conventional rail and bus systems are slow, overcrowded, unreliable, and rarely financially sustainable. They confine entire communities to narrow corridors — leaving millions underserved.

The Technology

Driverless. Electric. Elevated.

GreenVuba’s Automated Transit Network (ATN) runs small electric vehicles on dedicated elevated guideways — skipping unused stations, seating every passenger, and delivering 60 kph travel with minimal wait.

60 kph

Max Speed

10,000

Passengers/Hour/Direction

100%

Electric, Zero Emissions

Seated

Every Passenger, Every Trip

▶ In Public Operation Since 2023

▶ In Public Operation Since 2023

▶ How Stations Work

▶ How Stations Work

Side by Side

GreenVuba vs Legacy Transit

Every dimension of the GreenVuba experience outperforms conventional rail and bus — from wait times to financial sustainability.

❌ Legacy Transit

✓ GreenVuba

Why It Works

Built for Real Cities

The GreenVuba ATN system is engineered to fit into dense urban environments without massive disruption.

100% Electric

Zero direct emissions. Runs on renewable energy. Dramatically lower operating cost than diesel-powered alternatives.

🛤️

Elevated Guideways

No street-level disruption. Guideways slot into existing urban fabric with minimal land acquisition.

🛑

Station Bypass

Vehicles skip unused stations, delivering near-direct-route speed across a dense network of stops.

🔒

Personal Security

Small vehicles carry small groups. Passengers choose who they share with — dramatically improving safety for all riders.

💹

Financially Self-Sustaining

At US$0.15/passenger-km, revenue services the capital debt. No ongoing government subsidy required.

🌱

Green & Vibrant

Designed to build community, reduce car dependence, and create green corridors through urban neighbourhoods.

How It Operates

49 Stations · 33 km of Dedicated Guideways

A real-world scale deployment showing exactly what GreenVuba delivers — financially, operationally, and for commuters.

49

Stations

33 km

Dedicated Guideway (21 miles)

600

Small Electric Vehicles

17,600

Passengers per Hour Capacity

Financial Snapshot (Year 10)

Fare:    US$ 0.15 / passenger km

Capital Cost:    US$ 148 M

Annual O&M Cost:    US$ 2 M

Financing:    100% Debt @ 5%

Debt Payoff:    10 Years

▶ Sample Project Video

In the Field

Real Technology, Real Operation

GreenVuba ATN vehicles and stations are already serving passengers — not a prototype, not a concept.

Let's Talk

Ready to Transform Your City?

Whether you’re a city planner, investor, or transit authority — we’d love to show you what GreenVuba can do.